Turbo Pump & Controller

Turbo Pump & Controller

Our Rebuilding Process

  • Receiving – Each pump is inspected for damaged and missing parts
  • Evaluation – The pump is tested with the proper controller
  • Disassembly – The pump is dissembled and inspected for internal damage
  • Quotation – We quote you the cost for a standard repair
  • Cleaning – All parts are thoroughly cleaned
  • Assembly – Every pump is assembled using new O-rings, wicks, lubricating washers or nuts, and ultra-precision ceramic bearings
  • Balancing – Rotor assemblies are balanced in steps and a balancing repair is included with your pump
  • Final Assembly – Stator rings are installed, and the pump is ready for testing
  • Final Test – Every pump is tested for a minimum of 24 hours
  • Packaging – Each pump is bagged in plastic and packed in to a box with a foam-in-place system for maximum protection during shipping